Kidston Project

Merit Lining Systems are proud to be a part of the Genex Power Kidston Pumped Hydro Project under contract with McConnell Dowell and John Holland in far-North Queensland. In the…

Comments Off on Kidston Project

Successful Year

Merit Lining Systems is proud to announce that despite significant ongoing challenges relating to COVID and other world events, our team has continued uninterrupted, to deliver successful outcomes for our…

Comments Off on Successful Year

Design Projects

Location: Various locations in WA and QLD.   Client: Various clients throughout Australia. Materials: HDPE Liner, Geocomposite Project Overview: Our Charted Engineers provide technical services for the design of geosynthetic…

Comments Off on Design Projects

Secondary Contamination Tanks (Various Projects)

Location: Various locations in WA and QLD for different Clients.   Client: Various clients throughout Australia Materials: Concrete Canvas, HDPE Liner, Geotextile, Conductive HDPE Liner Project Overview: Installation of HDPE…

Comments Off on Secondary Contamination Tanks (Various Projects)

Prefabricated Liner

Prefabricated liner for different applications: We have capacity to supply prefabricated geomembrane for temporary and smaller applications. “Prefabs” sizes are limited to the materials thickness and road restrictions for safe…

Comments Off on Prefabricated Liner

Caloundra Landfill

Location: Caloundra, Sunshine Coast, QLD   Client: Sunshine Coast Council Time Frame: December 2019 – January 2020 Project Overview: Supply and installation of Geosynthetic materials (GCL, HDPE Liner, LLDPE Liner,…

Comments Off on Caloundra Landfill

Albany Waste Water Treatment Plant Upgrade

Location: Albany, WA   Client: Water Corporation Time Frame: November 2019 – January 2020 Project Overview: Design, supply and installation of double HDPE Liner System in existing Waste Water Treatment…

Comments Off on Albany Waste Water Treatment Plant Upgrade

South 32 Cannington (October 2019)

Application: Tailings Facility Trail Materials: Bituminous Geomembrane Total Area: 15,000m2   Client: South32 Additional information: Rope Access while welding with LPG Burners, Deployment by Hand, Nil access for Cranage, Evolving…

Comments Off on South 32 Cannington (October 2019)

Auburn Storage Dam

Location: Clare Valley, South Australia Time Frame: April - May 2019 Client: Exact Contracting Project Overview: 500ML storage dam for new vineyard required supply and installation of Geocomposite Drainage, Protection…

Comments Off on Auburn Storage Dam

Tinaroo – Papua New Guinea (February 2019)

Application: Contaminated Water Storage Materials: Bituminous Geomembrane (Coletanche ES3) Total Area: 70,000m2 | 2 Layers   Client: OK Tedi Additional information: Local Workforce under MLS Supervision, Ground Water, Stormwater (Tropical…

Comments Off on Tinaroo – Papua New Guinea (February 2019)