South 32 Cannington (October 2019)

Application Tailings Facility Trail Materials Bituminous Geomembrane Total Area 15,000m2 Client South32 Challenges Rope Access while welding with LPG Burners, Deployment by Hand, Nil access for Cranage, Evolving Design, High…

Comments Off on South 32 Cannington (October 2019)

Auburn Storage Dam

Location Clare Valley, South Australia Time Frame April - May 2019 Client Exact Contracting Project Overview 500ML storage dam for new vineyard required supply and installation of Geocomposite Drainage, Protection…

0 Comments

Tinaroo – Papua New Guinea (February 2019)

Application Contaminated Water Storage Materials Bituminous Geomembrane (Coletanche ES3) Total Area 70,000m2 | 2 Layers Client OK Tedi Challenges Local Workforce under MLS Supervision, Ground Water, Stormwater (Tropical Conditions, 1m…

Comments Off on Tinaroo – Papua New Guinea (February 2019)

Cosmos Mine Water Management Ponds

Location Odysseus Project, Cosmos Mine, Western Australia. Time Frame August - December 2018. Client Western Areas. Project Overview Merit Lining Systems installed 160,000m2 of 1.5mm HDPE Liner and 160,00m2 of…

0 Comments

Gold Coast Landfill (October 2018)

Application Construction and Demolition Waste Landfill Materials Geosynthetic Clay Liner, HDPE, Protection Geotextile, Filter Geotextile, Piping. Total Area 100,000m2 (Cell1a, Cell1b) Client BMI Group Challenges Budgetary Constraints, Evolving Design, Staged…

Comments Off on Gold Coast Landfill (October 2018)

FMG Cloudbreak Water Transfer (June 2018)

Application Water Transfer and Settlement Ponds Materials 1.5mm HDPE, Geotextile, Ballast, Access Egress, Level Indicators. Total Area 60,000m2 Client CAPE Utilities Challenges Contractor Interactions, High Temperature Welding, High Winds. Gallery…

Comments Off on FMG Cloudbreak Water Transfer (June 2018)

New Chum Landfill (2014-2018)

Application Construction and Demolition Waste Landfill Materials Geosynthetic Clay Liner (non-trafficable), HDPE, Protection Geotextile, Filter Geotextile. Total Area 400,000m2 (Cell 2a,3b,3a,4a,4b,5a,5b)4 Layers Client Cleanaway, formerly Transpacific. Challenges Stormwater Mitigation, Challenging…

Comments Off on New Chum Landfill (2014-2018)

Melbourne Regional Landfill (2016-2018)

Application Putrescible Landfill Materials GCL, 1.5mm HDPE, 1.5mm LLDPE, Geotextile Total Area 140,000m2 4 Layers (Cells 3A, 3B, Client Ertech, Shamrock Civil Challenges Geometry, Non-Trafficable Subgrade, Frequent Rainfall, Stormwater Mitigation,…

Comments Off on Melbourne Regional Landfill (2016-2018)

Balama – Mozambique (May 2017)

Application Tailings Facility Materials Bituminous Geomembrane (Teranap) Total Area 250,000m2 Client Syrah Resources Challenges Local Workforce under MLS Supervision, Challenging Subgrade, Isolated Mine, Cultural and Communications issues, Logistical Challenges, Personnel…

Comments Off on Balama – Mozambique (May 2017)

Anglesea Landfill (June 2016)

Application Putrescible Landfill Cell, Landfill Cap Materials GCL, 1.5mm HDPE, 1.5mm LLDPE, Geotextile Total Area 30,000m2 4 Layers Client Ertech Challenges Geometry, Non-Trafficable, Strong Winds and Frequent Rainfall and Soft…

Comments Off on Anglesea Landfill (June 2016)