New Chum Landfill (2014-2018)

New Chum Landfill (2014-2018)

  • Post category:Projects

Application

Construction and Demolition Waste Landfill

Materials

Geosynthetic Clay Liner (non-trafficable), HDPE, Protection Geotextile, Filter Geotextile.

Total Area

400,000m2 (Cell 2a,3b,3a,4a,4b,5a,5b)
4 Layers

Client

Cleanaway, formerly Transpacific.

Challenges

Stormwater Mitigation, Challenging Subgrade, Airspace limitations (Scheduling Constraints), Non-Trafficable Subgrade, Challenging Geometry.

Gallery

New Chum Landfill (2014-2018)