Project Overview:
Design, supply and installation of double HDPE Liner System in existing WWTP with Geonet with Conductive cushion Geotextile between liners. Double liner system was required, complete with a drainage medium and drainage pumps.
HDPE Liner was sealed to concrete structures and pipe penetrations.
Our liner system successfully passed the Electrical Leak Location Testing with Arc test method and independent Hydrostatic Leak Test carried out by the Client.