Auburn Storage Dam

Auburn Storage Dam

Location

Clare Valley, South Australia

Time Frame

April - May 2019

Client

Exact Contracting

Project Overview

500ML storage dam for new vineyard required supply and installation of Geocomposite Drainage, Protection Geotextile (~70,000 m2) and 1.5mm HDPE White Liner (~70,000 m2).

Merit Lining Systems provided permanent ballast on the walls and floor with the weight of 180kg/lm.

Scope of works also included installation of Geoladders, pipe penetrations and battening.

Third party testing contractor – TRI Australasia was engaged to perform Water Puddle Test on the floor and Water Lance Test on the batters.

Our team finished project successfully with keeping works in schedule and passing independent testing and Electrical Leak Detection survey.